WeChat QR
  • (+44)7467093787
  • info@canghaiconstruction.co.uk
  • Mon-Sat: 8:00 - 20:00

Restaurant Refurbishment & Commercial Fit-Out

  • Project Title

    Restaurant Refurbishment & Commercial Fit-Out

  • Category

    Shop renew

  • Location

    Stroud

  • Duration

    Less than 40 days

  • Total Cost

    Price available on request

  • Scope of Work

    Full restaurant refurbishment
    Commercial fit-out works
    Repair of deteriorated wall finishes
    Timber structure repairs
    Internal finishing and preparation for opening

  • Challenges

    Listed historic building
    Long period out of operation
    Severely deteriorated wall finishes and timber elements
    Tight programme before trading could begin

  • Solutions

    Delivered a fast-track refurbishment programme
    Repaired damaged historic fabric where required
    Completed the fit-out efficiently so the restaurant could reopen without delay

  • Client Feedback

    The owners were extremely pleased with the result and were able to begin trading immediately.

Located in the very heart of the Stroud neighbourhood, this restaurant was purchased by a lovely family. At the outset, the property was in a very poor condition. As a listed historic building, it had been out of operation for a long time, with extensive deterioration to the wall finishes and timber structure. In less than 40 days, we completed the full refurbishment and brought the restaurant back to life. The owners were extremely pleased with the result, as it allowed them to begin trading immediately. It was especially rewarding to see Sarah’s customers already visiting and enjoying the space as soon as the renovation was finished.